SPOT THE ASSUMPTION. ASK THE QUESTION.
01 / THE MISSING ITEMSThe cheaper quote covers less.
Imagine: A homeowner favours a £48,000 quote over a £54,000 quote. They later notice that scaffolding, waste removal and finishing are excluded from the lower price.
The consequence: Once the same work is priced, the apparent saving could disappear. A stated exclusion is something to compare, not evidence of dishonesty.
“Please confirm what is included and excluded against the same drawings and specification, and price the missing items.”
For the builder: Make exclusions prominent and explain who is responsible for them.
02 / THE ALLOWANCEThe finish costs more than the allowance.
Imagine: A quote allows £2,000 for supplying floor tiles. The homeowner’s chosen tiles cost £3,200 for the same area, with the same tax treatment.
The consequence: That selection adds £1,200 for supply alone. Adhesive, preparation, waste and fitting still need to be checked against the quote.
“What quantity and specification does this allowance cover, what is separate, and how will a different selection affect the price?”
For the builder: Record the basis of each allowance and how it will be adjusted.
03 / THE GROUND CONDITIONSThe digging reveals an unknown.
Imagine: Foundation work is priced against stated assumptions. Excavation reveals an unexpected drain or ground condition, and the appropriate project professional needs to advise on the next step.
The consequence: The required work and programme may change. A contingency budget alone does not explain how a change will be assessed or priced.
“What ground conditions have you allowed for, and how will extra work, cost and time be explained and agreed if those assumptions change?”
For the builder: State the assumptions and the process for documenting unexpected work.
04 / THE VERBAL CHANGE“While you’re here…” becomes extra work.
Imagine: During a renovation, the homeowner asks for additional sockets and a different light layout. Both sides agree verbally, but neither records the cost or effect on plastering and decoration.
The consequence: One person expects a small favour; the other expects payment for extra work. Rework and timing can be overlooked.
“Before we go ahead, can we record the change, the total price including any VAT, the making-good and the effect on the completion date?”
For the builder: Confirm and obtain agreement to changes in writing before carrying them out.
05 / THE PAYMENT STAGEThe date arrives before the stage is clear.
Imagine: A payment schedule says “third payment in week three”. A delivery delay changes the programme, and the homeowner and builder have different expectations about what that payment covers.
The consequence: An unclear trigger can strain trust and cash flow even when both sides intend to act fairly.
“What does each payment cover, what triggers it, how will completion be checked, and what happens if the programme changes?”
For the builder: Agree clear stages, amounts, due dates and any separately agreed deposit or material payments.
06 / THE OLD DRAWINGTwo builders price two different versions.
Imagine: One builder receives the original extension drawing. Another receives a revision with wider doors and a different rooflight. Both return a total under the same project name.
The consequence: The prices describe different work. If the mismatch is missed, it can also affect ordering and the programme.
“Which drawing numbers, revision dates and specification have you priced? Please confirm the same current set before we compare.”
For the builder: List the documents and revisions forming the basis of the quotation.