Six building pitfalls worth checking before you accept a quote or start work.

Follow a realistic scenario, see where the misunderstanding starts and take a clear question into your next conversation.

Illustrative scenarios. The stories and figures below are invented teaching examples, not accounts of Tom’s projects or customer testimonials. Prices are not estimates for your property.

A PRICE IS ONLY HALF THE PICTURE
Quote ASome work excluded£48,000
Quote BThat work included£54,000

Which covers the job you actually want?

See what changes when we compare the scope

SPOT THE ASSUMPTION. ASK THE QUESTION.

Six situations.
Six better conversations.

01 / THE MISSING ITEMS

The cheaper quote covers less.

Imagine: A homeowner favours a £48,000 quote over a £54,000 quote. They later notice that scaffolding, waste removal and finishing are excluded from the lower price.

The consequence: Once the same work is priced, the apparent saving could disappear. A stated exclusion is something to compare, not evidence of dishonesty.

“Please confirm what is included and excluded against the same drawings and specification, and price the missing items.”

For the builder: Make exclusions prominent and explain who is responsible for them.

02 / THE ALLOWANCE

The finish costs more than the allowance.

Imagine: A quote allows £2,000 for supplying floor tiles. The homeowner’s chosen tiles cost £3,200 for the same area, with the same tax treatment.

The consequence: That selection adds £1,200 for supply alone. Adhesive, preparation, waste and fitting still need to be checked against the quote.

“What quantity and specification does this allowance cover, what is separate, and how will a different selection affect the price?”

For the builder: Record the basis of each allowance and how it will be adjusted.

03 / THE GROUND CONDITIONS

The digging reveals an unknown.

Imagine: Foundation work is priced against stated assumptions. Excavation reveals an unexpected drain or ground condition, and the appropriate project professional needs to advise on the next step.

The consequence: The required work and programme may change. A contingency budget alone does not explain how a change will be assessed or priced.

“What ground conditions have you allowed for, and how will extra work, cost and time be explained and agreed if those assumptions change?”

For the builder: State the assumptions and the process for documenting unexpected work.

04 / THE VERBAL CHANGE

“While you’re here…” becomes extra work.

Imagine: During a renovation, the homeowner asks for additional sockets and a different light layout. Both sides agree verbally, but neither records the cost or effect on plastering and decoration.

The consequence: One person expects a small favour; the other expects payment for extra work. Rework and timing can be overlooked.

“Before we go ahead, can we record the change, the total price including any VAT, the making-good and the effect on the completion date?”

For the builder: Confirm and obtain agreement to changes in writing before carrying them out.

05 / THE PAYMENT STAGE

The date arrives before the stage is clear.

Imagine: A payment schedule says “third payment in week three”. A delivery delay changes the programme, and the homeowner and builder have different expectations about what that payment covers.

The consequence: An unclear trigger can strain trust and cash flow even when both sides intend to act fairly.

“What does each payment cover, what triggers it, how will completion be checked, and what happens if the programme changes?”

For the builder: Agree clear stages, amounts, due dates and any separately agreed deposit or material payments.

06 / THE OLD DRAWING

Two builders price two different versions.

Imagine: One builder receives the original extension drawing. Another receives a revision with wider doors and a different rooflight. Both return a total under the same project name.

The consequence: The prices describe different work. If the mismatch is missed, it can also affect ordering and the programme.

“Which drawing numbers, revision dates and specification have you priced? Please confirm the same current set before we compare.”

For the builder: List the documents and revisions forming the basis of the quotation.

WORKED TOOLKIT DEMONSTRATION · FREE

From two headline prices
to a useful comparison.

A fictional extension example. Both quotes are assumed to cover the same work except for the three items below. All figures use the same tax basis.

Compare the same work on the same tax basis
Cost to compareBuilder ABuilder B
Headline quote£48,000£54,000
Scaffolding+ £2,200Included
Waste removal+ £1,000Included
Same finishing work+ £4,000Included
Comparable total£55,200£54,000
THE COMPLETED COMPARISON

The apparent £6,000 saving changes.

£7,200 of missing work takes A to £55,200. On these assumptions, A is £1,200 higher than B. A lower headline figure is not enough to choose a builder.

Record each item as included, excluded, an allowance or unclear. Keep the written price or answer beside it.

A MESSAGE YOU CAN ADAPT
Thank you for your quotation. Before I compare it with the other prices, please confirm whether scaffolding, waste removal and the specified finishing are included against the current drawings and specification. Please identify exclusions and allowances, price any missing work, and confirm the revised total including any applicable VAT and any effect on the programme.

These are invented teaching figures, not a quote, a guaranteed saving or a recommendation of either builder. Only add an item once. An unknown remains “unclear”, not £0. Check experience, scope, timing and working arrangements alongside price.

USE THE METHOD ON YOUR OWN QUOTES

Read it. Record it.
Get the answer in writing.

The free four-page download contains the worked example, six scenario prompts and a blank printable comparison sheet. Use it to prepare your next conversation.

For the complete Lesson 01, explore the 4-minute-11-second video and three-page fillable or printable toolkit, including clarification wording.

LESSON 01 + PRACTICAL TOOLKIT£250

One payment · No subscription
Other lessons sold separately

See exactly what’s included →Ask whether it fits your project →