BEFORE THE DRAWINGS. BEFORE THE QUOTE.
Know your project.
Plan your budget.
A clearer starting point for your building plans. Choose your project, explore the guide costs and see what needs to be agreed before work starts.
Explore the cost guideSwipe across to explore all four projects →
Simple illustrations of the work area · Not construction drawings
All three specifications use the same roof alteration and 30 m² example.
An unspent reserve for uncertainty, not a charge from your builder.
The building-work prices exclude VAT. Confirm the actual treatment with the contractor.
Basic, Mid-range or High-spec?
Three separate costs. Three defined outcomes.
Ranges allow for variation within each specification. They are not fixed quotes or maximum prices. Prices are rounded to the nearest £100; displayed rates are rounded to the nearest £10/m². View price source and calculation basis.
What changes between the three finishes?
These are illustrative finish examples, not a supplier schedule from the price source. Agree product ranges, quantities and allowances in writing before a quote becomes a contract. Nothing marked “extra” is included in the figures.
| Item | Basic | Mid-range | High-spec |
|---|
Outside all three prices
What must be checked on site?
Turn the chosen finish into a written specification
“High spec” on its own is not enough. The builder’s quotation should record:
- Drawings, measurements and exactly which rooms or new floors are included.
- Brands or product ranges, quantities, supply allowances and who buys each item.
- Foundations, structural work, drainage and service assumptions, with limits stated.
- Included work, excluded work and provisional sums, each priced clearly.
- VAT treatment and a written price agreement before any change goes ahead.
02 / UNDERSTAND THE LABOUR
What does a
day on site cost?
A day rate is the charge for labour, not the cost of a finished job. Compare the scope and likely time as well as the rate.
Use this table to understand labour quotations. These rates are not added to the calculator.
| Trade | Published guide |
|---|---|
| General builder | About £300 |
| Labourer | £120–£280 |
| Carpenter | £240–£450 |
| Bricklayer | £250–£350 |
| Plumber | £320–£480 |
| Electrician | £300–£500 |
| Plasterer | About £300 |
Checkatrade, October 2026. The source does not specify VAT status or a standard day length. Materials are separate; confirm VAT, hours, travel and equipment in your quote. Source
How these guide prices were put together Sources & assumptions
Reviewed 11 November 2026. All three specifications are shown separately for the same project size and scope. The finish examples are Before You Build example briefs; published cost bands do not guarantee particular products. Confirm local quotations against an agreed written specification.
- BestBuilders — 2026 extension specification bandsUses the published single-storey rear and double-storey rear Basic / Standard / High bands, before VAT. “Standard” is labelled “Mid-range” here. The rate is multiplied by internal area; two-storey area is both floors combined. Normal construction and access assumed. Premium glazing and fitted kitchens/bathrooms remain separate. These are regional UK benchmarks, not a Kent tariff.
- Estiquote — loft types and finish bandsSeptember 2026 data, updated October. Fixed 30 m² UK examples outside London; Budget / Mid-range / Premium are relabelled Basic / Mid-range / High-spec. Published figures include 20% VAT: divided by 1.20 once to obtain the underlying build price. An en-suite is excluded at every level. These examples cannot be scaled to another size.
- Estiquote — whole-house refurbishment finish bandsSeptember 2026, updated October. The 90 m² UK reference prices include VAT, a kitchen, bathroom, renewed services and internal finishes. This guide divides by 1.20, then by 90 to derive a build rate; it scales that rate only for 60–130 m². This proportional scaling is our approximation. The source’s independently rounded size examples can differ slightly. It is not a cosmetic-refresh or structural-rebuild model.
- Checkatrade — tradesperson costsOriginal October 2026 labour guide retained. Day rates are for context and are never added to building-work prices.
- GOV.UK — VAT for buildersThe optional illustration uses 20%; actual treatment depends on the work and supplier. VAT is calculated on building work. The contingency reserve is a percentage of the build including VAT when selected, allowing for VAT if that reserve is spent.
Calculation: building work + selected VAT + separate contingency reserve = the displayed build allowance. Unpriced exclusions and fees still need adding. Calculations retain unrounded values; displayed amounts may differ slightly when added. Source data for lofts and refurbishment is adapted from Estiquote’s UK Renovation Cost Index (CC BY 4.0), with VAT removed and refurbishment rates derived as described above.
Compare quotations against the same written scope and specification.