PROJECT COST GUIDE Basic · Mid-range · High-spec
Before You BuildPRACTICAL HOMEOWNER GUIDANCE

BEFORE THE DRAWINGS. BEFORE THE QUOTE.

Know your project.
Plan your budget.

A clearer starting point for your building plans. Choose your project, explore the guide costs and see what needs to be agreed before work starts.

Explore the cost guide

Swipe across to explore all four projects →

Simple illustrations of the work area · Not construction drawings

01 / COMPARE THE SPECIFICATION2026 cost guides · checked 11 November 2026

m²

An unspent reserve for uncertainty, not a charge from your builder.

The building-work prices exclude VAT. Confirm the actual treatment with the contractor.

Same core work. Three finish levels.

Basic does not mean lower safety or structural standards. The required structure, insulation and safety measures must be met at every level.

Basic, Mid-range or High-spec?

Three separate costs. Three defined outcomes.

Ranges allow for variation within each specification. They are not fixed quotes or maximum prices. Prices are rounded to the nearest £100; displayed rates are rounded to the nearest £10/m². View price source and calculation basis.

What changes between the three finishes?

These are illustrative finish examples, not a supplier schedule from the price source. Agree product ranges, quantities and allowances in writing before a quote becomes a contract. Nothing marked “extra” is included in the figures.

ItemBasicMid-rangeHigh-spec

Outside all three prices

What must be checked on site?

Turn the chosen finish into a written specification

“High spec” on its own is not enough. The builder’s quotation should record:

  • Drawings, measurements and exactly which rooms or new floors are included.
  • Brands or product ranges, quantities, supply allowances and who buys each item.
  • Foundations, structural work, drainage and service assumptions, with limits stated.
  • Included work, excluded work and provisional sums, each priced clearly.
  • VAT treatment and a written price agreement before any change goes ahead.
Location is separate from specification. These are UK comparison benchmarks, not Kent quotations. London and the South East can cost more. No regional uplift is automatically applied; agree local prices against the same scope.

02 / UNDERSTAND THE LABOUR

What does a
day on site cost?

A day rate is the charge for labour, not the cost of a finished job. Compare the scope and likely time as well as the rate.

Already included in build costs

Use this table to understand labour quotations. These rates are not added to the calculator.

UK labour guides · per person, per day
TradePublished guide
General builderAbout £300
Labourer£120–£280
Carpenter£240–£450
Bricklayer£250–£350
Plumber£320–£480
Electrician£300–£500
PlastererAbout £300

Checkatrade, October 2026. The source does not specify VAT status or a standard day length. Materials are separate; confirm VAT, hours, travel and equipment in your quote. Source

03 / TURN AN IDEA INTO A CLEAR BRIEF

The number is a start.
The details make the difference.

Record the rooms, finish, responsibilities and unknowns before comparing quotations. Our tutorials and worksheets help you ask the right questions.

Explore the project-brief lesson
How these guide prices were put together Sources & assumptions

Reviewed 11 November 2026. All three specifications are shown separately for the same project size and scope. The finish examples are Before You Build example briefs; published cost bands do not guarantee particular products. Confirm local quotations against an agreed written specification.

  1. BestBuilders — 2026 extension specification bandsUses the published single-storey rear and double-storey rear Basic / Standard / High bands, before VAT. “Standard” is labelled “Mid-range” here. The rate is multiplied by internal area; two-storey area is both floors combined. Normal construction and access assumed. Premium glazing and fitted kitchens/bathrooms remain separate. These are regional UK benchmarks, not a Kent tariff.
  2. Estiquote — loft types and finish bandsSeptember 2026 data, updated October. Fixed 30 m² UK examples outside London; Budget / Mid-range / Premium are relabelled Basic / Mid-range / High-spec. Published figures include 20% VAT: divided by 1.20 once to obtain the underlying build price. An en-suite is excluded at every level. These examples cannot be scaled to another size.
  3. Estiquote — whole-house refurbishment finish bandsSeptember 2026, updated October. The 90 m² UK reference prices include VAT, a kitchen, bathroom, renewed services and internal finishes. This guide divides by 1.20, then by 90 to derive a build rate; it scales that rate only for 60–130 m². This proportional scaling is our approximation. The source’s independently rounded size examples can differ slightly. It is not a cosmetic-refresh or structural-rebuild model.
  4. Checkatrade — tradesperson costsOriginal October 2026 labour guide retained. Day rates are for context and are never added to building-work prices.
  5. GOV.UK — VAT for buildersThe optional illustration uses 20%; actual treatment depends on the work and supplier. VAT is calculated on building work. The contingency reserve is a percentage of the build including VAT when selected, allowing for VAT if that reserve is spent.

Calculation: building work + selected VAT + separate contingency reserve = the displayed build allowance. Unpriced exclusions and fees still need adding. Calculations retain unrounded values; displayed amounts may differ slightly when added. Source data for lofts and refurbishment is adapted from Estiquote’s UK Renovation Cost Index (CC BY 4.0), with VAT removed and refurbishment rates derived as described above.

Compare quotations against the same written scope and specification.